Loading…
OTC Value

Commodity basis swap

Value the average difference between two commodity references against a contractual differential, with separate tracking of determined and open components.

How it works

A basis swap focuses on relative prices rather than one outright commodity price. Each reference can independently be an organization quote or a listed Future. The two references share the same observation dates, allowing each day's spread to contribute equally to the contract result.

Key contract terms

  • Purchase or sale and total quantity
  • Reference A and reference B, each with its own price source
  • Exactly matching currency and commodity unit
  • Common averaging period and fixing calendar
  • Contractual differential K, which may be positive, zero or negative

Payoff: the contractual result

For a purchase, payoff is quantity × (average of A − B − K). A sale reverses the sign. The quantity is divided equally among fixing days. Before period end, the valuation discounts these components and separates finalized amounts from remaining exposure.

A simple example

For a purchase of 100 units, average A is EUR 220 and average B is EUR 205. With K = EUR 10 per unit, the final result is 100 × (220 − 205 − 10) = EUR 500. The corresponding sale produces EUR −500.

Illustrative amounts exclude fees and currency conversion. A payoff is distinct from the instrument's value before maturity.

Lifecycle

Lifecycle overview
  1. Contract created
  2. Two references for each fixing
  3. Progressive realization
  4. All components finalized
  1. Create the two price references, common fixing calendar and contractual differential.
  2. At each fixing date, observe both references. The corresponding component becomes realized only when both values are final under their respective data rules.
  3. Realization is progressive: confirmed components and still-open components coexist. It does not require a user exercise or create a separate position for each day.
  4. All components must be final to finalize the whole contract. Corrections to source prices may change previously realized amounts on revaluation; realized does not mean already paid.

Using this instrument in OTCValue

There is no currency or unit conversion between references. A quote independent of Futures may carry forward its last known price and become final after fixing day. Future-dependent references require exact settlements. Futures must cover the averaging period. This models a differential, not an option; realization does not record payment.

An error occurred while processing your request. Reload